Insulation Performance

Evaluation

Insulation Performance

Evaluation

TECHNICAL OVERVIEW

Through On/Offline Data

Heavy Electric Equipment Condition Analysis System

It provides integrated management of offline insulation diagnosis test results and online partial discharge monitoring results.


We provide an optimal solution by analyzing trends and artificial intelligence of offline data.

Prevent failures during operation through online partial discharge monitoring.

ON-LINE TEST

Online Test Assessment

For online test evaluation, we install an Online PD sensor on each machine and measure the machine data in real time.


PACT-Alliance online test evaluation monitors and warns of partial discharge trends and provides expert-level automatic analysis results.

Online Sensor Installation

High Voltage Rotating Machine Online Insulation Diagnosis

All High voltage rotating machine deteriorate as the number of years of service increases, and voids created by deterioration cause partial discharge during operation.


The state of the device can be grasped through trend management of the location and amount of partial discharge during operation.

Online Partial Discharge Analysis 

Online Partial Discharge Applicable Fields 

OFF-LINE TEST

Offline Test Assessment

Specialists directly visit the site and conduct insulation integrity tests of heavy electric equipment (generators, motors, and transformers)

High Voltage Rotating Machine Offline Insulation Diagnosis

In the High voltage rotating machine insulation system (mica-epoxy), voids are created/growth inside the insulator as the operating time elapses, and eventually the insulation is broken.


Through regular testing, the deterioration process is identified, and maintenance such as insulation reinforcement and rewinding is recommended before insulation breakdown.

Insulation Test Equipment 

Generator Standards

Test Items Test voltage Good criterion 
Megger[GΩ]
DC 5㎸0.1 or more
PI
DC 5㎸2.0 or more 
ΔI[%]
E5.0 or more 
Δtanδ[%]
E
2.5 or more 
PD[pC]
E/√3
less than 30,000

6.6[㎸] Motor Standards 

Test Items Test voltage Good criterion
Megger[GΩ]
DC 5㎸0.1 or more 
PI
DC 5㎸2.0 or more 
ΔI[%]
Eless than 8.5
Δtanδ[%]
E
less than 6.5
PD[pC]
E/√3
less than 10,000

TECHNICAL OVERVIEW

Through On/Offline Data
Heavy Electric Equipment Condition Analysis System
It provides integrated management of offline insulation diagnosis test results and online partial discharge monitoring results.
We provide an optimal solution by analyzing trends and artificial intelligence of offline data.
Prevent failures during operation through online partial discharge monitoring.

ON-LINE TEST

Online Test Assessment
For online test evaluation, we install an Online PD sensor on each machine and measure the machine data in real time.
PACT-Alliance online test evaluation monitors and warns of partial discharge trends and provides expert-level automatic analysis results.
Hover your mouse button.
Hover your mouse button.
High Voltage Rotating Machine

Online Insulation Diagnosis

All High voltage rotating machine deteriorate as the number of years of service increases, and voids created by deterioration cause partial discharge during operation.
The state of the device can be grasped through trend management of the location and amount of partial discharge during operation.
Online Partial Discharge Analysis 
Online Partial Discharge Applicable Fields 

OFF-LINE TEST

Offline Test Assessment
Specialists directly visit the site and conduct insulation integrity tests of heavy electric equipment (generators, motors, and transformers).
High Voltage Rotating Machine

Offline Insulation Diagnosis

In the High voltage rotating machine insulation system (mica-epoxy), voids are created/growth inside the insulator as the operating time elapses, and eventually the insulation is broken.
Through regular testing, the deterioration process is identified, and maintenance such as insulation reinforcement and rewinding is recommended before insulation breakdown.
Insulation Test Equipment 
Generator Standards
Test Items 
Megger[GΩ]
PI
ΔI[%]
Δtanδ[%]
PD[pC]
Test voltage 
DC 5㎸
DC 5㎸
E
E
E/√3
Good criterion 
0.1 or more 
2.0 or more 
5.0 or more 
2.5 or more 
less than 30,000
6.6[㎸] Motor Standards  
Test Items 
Megger[GΩ]
PI
ΔI[%]
Δtanδ[%]
PD[pC]
Test voltage 
DC 5㎸
DC 5㎸
E
E
E/√3
Good criterion 
0.1 or more 
2.0 or more 
less than 8.5
less than 6.5
less than 10,000

PACT-Alliance Co,. Ltd.  |  CEO : Sang-Hoon LEE

Business registration number : 766-87-01492

Isangwan 53, Myeoncheonsinchon-gil, Myeoncheon-myeon, Dangjin-si, Chungcheongnam-do

Customer Center : +82) 041-357-7926



© PACT-Alliance. All rights reserved. 

PACT-Alliance Co., Ltd   |   CEO : Sang-Hoon LEE   |   Business registration number : 766-87-01492

Isan Hall 53, Myeoncheonshinchon-gil, Myeoncheon-myeon, Dangjin-si, Chungcheongnam-do  

Customer Center : +82) 041-357-7926 

© PACT-Alliance. All rights reserved.